Construct an 18.9 km cross-border railway and cargo transfer terminal at Gashuunsukhait-Gantsmod port
Launch a pilot plant to produce end products from energy coal
Construct a cross-border railway and cargo transfer terminal at Hangi-Mandal border port
Build a 300 km section of the 1255 km Artsuur-Shiveekhuren-Nariinsukhait railway (Shiveekhuren to Shinejinst)
Construct the Shiveekhuren-Sehee cross-border railway
Expand and upgrade the 327-meter bridge on Ulaanbaatar–Lun road to 4 lanes
Expand and upgrade the 101.7 km Ulaanbaatar–Lun highway to 4 lanes
Build a border-connecting railway from Bichigt to Zuunkhatawch under the 426.7 km Choibalsan–Khoot–Bichigt railway project
Construct the north–south vertical railway from Choibalsan to Bichigt
Start construction of a gold refining plant
Construct a coal export terminal at Yarant port in Bulgan soum, Khovd province
Upgrade Baytag port in Bulgan soum, Khovd province to a permanent operating status
Expand the Nalaikh–Zamiin-Uud road to 4 lanes
Implement a project to connect Burgastai border port with a 320 km paved road
Build 10 MW solar and 5–20 MWh battery storage plants in Arkhangai, Uvurkhangai, and Bayankhongor provinces
Upgrade “Khovd” airport to 4C classification and improve its capacity
Upgrade “Murun” airport to 4C classification and improve its capacity
Upgrade “Choibalsan” airport to 4C classification and improve its capacity
Upgrade “Gurvansaihan” airport to 4D classification and improve its capacity
Establish service complexes and rest areas along national and local roads
Build an integrated steel manufacturing complex near Darkhan Metallurgical Plant
Prepare for construction of a coke-chemical complex based on “Tavantolgoi” industrial and tech park
Develop legal framework and introduce fintech standards to regulate and expand technology-driven microfinance services
Ensure readiness of the Kherlen–Toono and Orkhon–Ongi water supply and storage projects
Establish a cargo and construction material logistics hub in the Altanbulag Free Zone
Implement the “Blue Bear’s Den” tourism project in Khuvsgul province
Implement the 1800-unit “Eco Yarmag-1” urban redevelopment housing project
Build 5616 housing units affordable for low- and middle-income citizens
Construct an 800-meter bridge on Naadamchdyn Street to connect Tuul and Nukhit roads
Begin construction of a high-capacity public transport system: the “Metro” project
Construct and commission the Böörljüüt thermal power plant through public-private partnership
Build the Shiveekhüren–Nariinsukhait–Shinejinst railway section as part of the 1,255 km Artssuur–Shiveekhüren–Nariinsukhait railway project
Construct 261.65 km road between Uliastai and Murun
Construct 6.9 km cross-border railway at Shiveekhüren–Sekhee border point
Construct 0.6 km cross-border railway at Khangi–Mandal border point
Construct cargo terminals at Khavirga, Bichigt, and Bulgan border points
Construct second railway along Khangi–Nomgon–Khushig Valley–Sükhbaatar route
Build a 426 km railway between Choibalsan–Khoot–Bichigt border point
Construct 481 km railway along Zuunbayan–Sainshand–Baruun-Urt–Khoot
Construct 417 km railway from Tsogttsetsii soum to Dalanzadgad and Shiveekhüren border
Establish a construction material plant based on the cement factory, in cooperation with relevant organizations
Gradually delegate certain government functions to professional associations and enhance accountability
Establish Erdenet Machinery Industrial Complex
Construct a cross-border railway from Bichigt to Zuunkhatawch border post
Construct a 384 km first-class freight and passenger railway from Ulaanbaatar to the new Kharkhorum city
Construct a 2-lane special purpose road along Khushig Valley–Choir–Sainshand–Zamiin-Uud
Support domestic cement and lime production using local raw materials (e.g. limestone), and increase output share
Establish service complexes with rest stops and temporary lodging along major tourism routes