1

Construct an 18.9 km cross-border railway and cargo transfer terminal at Gashuunsukhait-Gantsmod port

2

Launch a pilot plant to produce end products from energy coal

3

Construct a cross-border railway and cargo transfer terminal at Hangi-Mandal border port

4

Build a 300 km section of the 1255 km Artsuur-Shiveekhuren-Nariinsukhait railway (Shiveekhuren to Shinejinst)

5

Construct the Shiveekhuren-Sehee cross-border railway

6

Expand and upgrade the 327-meter bridge on Ulaanbaatar–Lun road to 4 lanes

7

Expand and upgrade the 101.7 km Ulaanbaatar–Lun highway to 4 lanes

8

Build a border-connecting railway from Bichigt to Zuunkhatawch under the 426.7 km Choibalsan–Khoot–Bichigt railway project

9

Construct the north–south vertical railway from Choibalsan to Bichigt

10

Start construction of a gold refining plant

11

Construct a coal export terminal at Yarant port in Bulgan soum, Khovd province

12

Upgrade Baytag port in Bulgan soum, Khovd province to a permanent operating status

13

Expand the Nalaikh–Zamiin-Uud road to 4 lanes

14

Implement a project to connect Burgastai border port with a 320 km paved road

15

Build 10 MW solar and 5–20 MWh battery storage plants in Arkhangai, Uvurkhangai, and Bayankhongor provinces

16

Upgrade “Khovd” airport to 4C classification and improve its capacity

17

Upgrade “Murun” airport to 4C classification and improve its capacity

18

Upgrade “Choibalsan” airport to 4C classification and improve its capacity

19

Upgrade “Gurvansaihan” airport to 4D classification and improve its capacity

20

Establish service complexes and rest areas along national and local roads

21

Build an integrated steel manufacturing complex near Darkhan Metallurgical Plant

22

Prepare for construction of a coke-chemical complex based on “Tavantolgoi” industrial and tech park

23

Develop legal framework and introduce fintech standards to regulate and expand technology-driven microfinance services

24

Ensure readiness of the Kherlen–Toono and Orkhon–Ongi water supply and storage projects

25

Establish a cargo and construction material logistics hub in the Altanbulag Free Zone

26

Implement the “Blue Bear’s Den” tourism project in Khuvsgul province

27

Implement the 1800-unit “Eco Yarmag-1” urban redevelopment housing project

28

Build 5616 housing units affordable for low- and middle-income citizens

29

Construct an 800-meter bridge on Naadamchdyn Street to connect Tuul and Nukhit roads

30

Begin construction of a high-capacity public transport system: the “Metro” project

Government Action Plan 2024–2028

1

Construct and commission the Böörljüüt thermal power plant through public-private partnership

2

Build the Shiveekhüren–Nariinsukhait–Shinejinst railway section as part of the 1,255 km Artssuur–Shiveekhüren–Nariinsukhait railway project

3

Construct 261.65 km road between Uliastai and Murun

4

Construct 6.9 km cross-border railway at Shiveekhüren–Sekhee border point

5

Construct 0.6 km cross-border railway at Khangi–Mandal border point

6

Construct cargo terminals at Khavirga, Bichigt, and Bulgan border points

7

Construct second railway along Khangi–Nomgon–Khushig Valley–Sükhbaatar route

8

Build a 426 km railway between Choibalsan–Khoot–Bichigt border point

9

Construct 481 km railway along Zuunbayan–Sainshand–Baruun-Urt–Khoot

10

Construct 417 km railway from Tsogttsetsii soum to Dalanzadgad and Shiveekhüren border

11

Establish a construction material plant based on the cement factory, in cooperation with relevant organizations

12

Gradually delegate certain government functions to professional associations and enhance accountability

13

Establish Erdenet Machinery Industrial Complex

14

Construct a cross-border railway from Bichigt to Zuunkhatawch border post

15

Construct a 384 km first-class freight and passenger railway from Ulaanbaatar to the new Kharkhorum city

16

Construct a 2-lane special purpose road along Khushig Valley–Choir–Sainshand–Zamiin-Uud

17

Support domestic cement and lime production using local raw materials (e.g. limestone), and increase output share

18

Establish service complexes with rest stops and temporary lodging along major tourism routes